02/10/2024 - Cambridgeshire and Peterborough Business Growth Company Limited

To instruct officers to undertake the actions required to wind up the Cambridgeshire and Peterborough Business Growth Company Limited

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Richard Kenny

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Water Resources East

To receive an update on the work of Water Resources East

Decision Maker: Environment and Sustainable Communities Committee

Decision due date: 11/12/2024

Lead officer: Adrian Cannard

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Fen Road Trial KD2024/059

To approve the Fen Roads Trail Full Business Case

Decision Maker: Investment Committee

Decision due date: 16/12/2024

Lead officer: Adrian Cannard

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Future Fens KD2024/058

To approve the Future Fens Full Business Case and funding for delivery

Decision Maker: Investment Committee

Decision due date: 25/11/2024

Lead officer: Adrian Cannard

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Great Ouse Valley Trust

Update on the work of the Great Ouse Valley Trust

Decision Maker: Environment and Sustainable Communities Committee

Decision due date: 25/10/2024

Lead officer: Adrian Cannard

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - SAF Business Case Approvals - Chief Executive Decisions

To note the Chief Executive business case decisions for projects less than £1m under the single assurance framework

Decision Maker: Investment Committee

Decision due date: 21/10/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - SAF Business Case Approvals - Chief Executive Decisions

To note the Chief Executive business case decisions for projects less than £1m under the single assurance framework

Decision Maker: Investment Committee

Decision due date: 13/01/2025

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - SAF Business Case Approvals - Chief Executive Decisions

To note the Chief Executive business case decisions for projects less than £1m under the single assurance framework

Decision Maker: Investment Committee

Decision due date: 16/12/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - SAF Business Case Approvals - Chief Executive Decisions

To note the Chief Executive business case decisions for projects less than £1m under the single assurance framework

Decision Maker: Investment Committee

Decision due date: 25/11/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Concept Papers

To note the concept papers prior to their presentation at the CA Board

Decision Maker: Investment Committee

Decision due date: 13/01/2025

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Concept Papers

To note the concept papers prior to their presentation at the CA Board

Decision Maker: Investment Committee

Decision due date: 16/12/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Concept Papers

To note the concept papers prior to their presentation at the CA Board

Decision Maker: Investment Committee

Decision due date: 25/11/2024

Lead officer: Janice Gotts, Joanna Morley

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Concept Papers

To note the concept papers prior to their presentation to the CPCA Board.

Decision Maker: Investment Committee

Decision due date: 21/10/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Homes England Strategic Place Partnership - KD2024/056

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Rob Bridge

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - GSENZH delivery of Warmer Homes – Local Grant Scheme - KD2024/055

To approve GSENZH to apply for and deliver the Warmer Homes – Local Grant scheme across a consortia of Local Authorities in the GSENZH area using capital grant funding from DESNZ over a 3-5 year period

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Maxine Narburgh

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Improvement Framework - Next Steps

To note the next steps in regard to the Improvement Framework

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Janice Gotts

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Fen Roads: Economic Impact Assessment for Peat Soil Affected Roads

The report proposes a scope to enable the development of the Fen Roads Economic Impact Assessment for Peat Soil Affected Roads

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Anna Graham

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Monitoring and Evaluation Update

To update members on the monitoring and evaluating of the LTCP and Transport

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Emma White

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Infrastructure Delivery Framework - Final Draft KD2024/049

To present the final draft of the Infrastructure Delivery Framework for approval.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Judith Barker

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Infrastructure Delivery Framework - Update

To note the final draft of the Infrastructure Delivery Framework

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Judith Barker

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Peterborough R&D Property Company Limited (PropCo2) - KD2024/050

Amend the conditionality given with the CPCA shareholder approval granted by CPCA Board in March 2023 that Anglia Ruskin University(ARU) become a shareholder in Peterborough R&D Property Company Limited (PropCo2) and that ARU be granted a head lease of the property known as Phase 2 of the ARU Peterborough development

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Jim Cunningham

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Fenland Soil

To receive an update on the work of Fenland Soil

Decision Maker: Environment and Sustainable Communities Committee

Decision due date: 25/10/2024

Lead officer: Adrian Cannard

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Greater Cambridge Transport Strategy – Update

To update Members on the Greater Cambridge Transport Strategy

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Emma White

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Ely to Cambridge Corridor update

Update on progress of the Ely to Cambridge Corridor project with focus on delivery of key gateway review.

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Matthew Lutz

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - Net Zero Hub Budgets

To report the Executive Director’s use of delegated authority agreeing to revised Net Zero Hub Budgets (covering 2024/25, 2025/26 and 2026/27 budgets)

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Maxine Narburgh

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/10/2024 - A141 – update on progress and engagement

Update on A141 project progress and delivery including engagement including public consultation

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Matthew Lutz

Notice of decision: 02/10/2024

Anticipated restriction: Open


02/09/2024 - Climate Programme KD2024/055

To agree approach to the next bidding round and to agree scope of the next climate review

Decision Maker: Environment and Sustainable Communities Committee

Decision due date: 25/10/2024

Lead officer: Adrian Cannard

Notice of decision: 26/09/2024

Anticipated restriction: Open


01/08/2024 - Shared Ambition for Cambridgeshire & Peterborough KD2024-031

To approve the draft Shared Ambition for Cambridgeshire & Peterborough

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Kate McFarlane

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - HR Policy Update

Updating key HR Policies

Decision Maker: Human Resources Committee

Decision due date: 15/11/2024

Lead officer: Nicky McLoughlin

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Constituent Authority Update

To provide Business Board members with an update from one of the Constituent Authorities.

Decision Maker: Business Board

Decision due date: 31/03/2025

Lead officer: TBC

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Constituent Authority Update

To provide Business Board members with an update from one of the Constituent Authorities.

Decision Maker: Business Board

Decision due date: 20/01/2025

Lead officer: TBC

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Skills Brokerage and Future Skills Support for Business

To brief Members on plans for continuity of service beyond UKSPF funding

Decision Maker: Business Board

Decision due date: 11/11/2024

Lead officer: Alexis McLeod

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Constituent Authority Update

To provide Business Board members with an update from Fenland District Council.

Decision Maker: Business Board

Decision due date: 11/11/2024

Lead officer: TBC

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Connecting Cambridgeshire Digital Strategy

To endorse the latest iteration of the Cambridgeshire Digital Strategy, produced in partnership with Connecting Cambridgeshire

Decision Maker: Business Board

Decision due date: 11/11/2024

Lead officer: Domenico Cirillo

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Shared Prosperity Fund KD2024/052

To provide an update to Business Board members on progress to date pertaining to the Share Prosperity Fund.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Steve Clarke

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Mid-Year Review (Skills)

To receive a progress report on mid-term performance: funding and strategic focus

Decision Maker: Business Board

Decision due date: 11/11/2024

Lead officer: Andrea Wood

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Corporate Risk Report

To present the Corporate Risk Report Q3 2024/25 for Members' scrutiny

Decision Maker: Combined Authority Board

Decision due date: 02/04/2025

Lead officer: Chris Bolton

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Corporate Risk Report

To present the Corporate Risk Report Q2 2024/25 for Members' scrutiny

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Chris Bolton

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Draft Local Nature Recovery Strategy KD2024/029

To agree a Draft Local Nature Recovery Strategy for public consultation.

Decision Maker: Environment and Sustainable Communities Committee

Decision due date: 25/10/2024

Lead officer: Adrian Cannard

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Review of Investment Concept Papers KD2024/045

To approve concept papers recommended from the Investment Panel

Decision Maker: Combined Authority Board

Decision due date: 02/04/2025

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Corporate Performance Report

To present the Corporate Performance Report Q3 2024/25 for Members' scrutiny

Decision Maker: Combined Authority Board

Decision due date: 02/04/2025

Lead officer: Jules Ient

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Combined Authority Chief Executive Highlights Report

Providing a general update on the key activities of the Combined Authority since the last meeting.

Decision Maker: Combined Authority Board

Decision due date: 02/04/2025

Lead officer: Rob Bridge

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Updates to the Constitution

To present to the Board the sections of the Constitution that have been reviewed/proposed amendments.

Decision Maker: Combined Authority Board

Decision due date: 02/04/2025

Lead officer: Matthew Cumberbatch

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Review of Investment Concept Papers KD2024/044

To approve concept papers recommended from the Investment Panel

Decision Maker: Combined Authority Board

Decision due date: 19/03/2025

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Budget Monitoring Update

To provide an update on the revenue and capital budgets for the year to date and approving draft carry-forwards.

Decision Maker: Combined Authority Board

Decision due date: 19/03/2025

Lead officer: Rob Emery

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Combined Authority Chief Executive Highlights Report

Providing a general update on the key activities of the Combined Authority since the last meeting.

Decision Maker: Combined Authority Board

Decision due date: 19/03/2025

Lead officer: Rob Bridge

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Updates to the Constitution

To present to the Board the sections of the Constitution that have been reviewed/proposed amendments.

Decision Maker: Combined Authority Board

Decision due date: 19/03/2025

Lead officer: Matthew Cumberbatch

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Local Nature Recovery Strategy KD2024/030

To recommend the Local Nature Recovery Strategy for adoption.

Decision Maker: Combined Authority Board

Decision due date: 19/03/2025

Lead officer: Adrian Cannard

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Review of Investment Concept Papers KD2024/043

To approve concept papers recommended from the Investment Panel

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Business Rate Supplement Powers and Process

To provide a summary of the Combined Authority’s powers to levy a Business Rates Supplement, potential timelines, and high-level modelling of the amounts which could be raised.

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Gateway Review Mid-Term Report

To note progress of the Gateway Review Mid-term Report.

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Jules Ient

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Mayor's Budget KD2024/004

To agree the Mayor’s draft budget for 2025/26

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Rob Emery

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Budget Monitoring Update

To provide an update on the revenue and capital budgets for the year to date.

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Rob Emery

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Updates to the Constitution

To present to the Board the sections of the Constitution that have been reviewed/proposed amendments.

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Matthew Cumberbatch

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Wisbech to March Rail KD2024/010

Update on the development of Network Rail’s options appraisal report and decision to be made on which option to proceed with to allow the scheme to proceed.

Decision Maker: Transport and Infrastructure Committee

Decision due date: 04/11/2024

Lead officer: Matthew Lutz

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Depot for Electric Buses - Interim Feasibility Report

To consider a feasibility study undertaken to assess the viability of providing a bus depot facility in Peterborough.

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Nick Sweeney

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Peterborough Station Quarter KD2024/053

Update on progress to develop the full business case

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Gidon Wieder

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Mobility Hub Planning

Report on progress and next steps for the mobility hub programme, seek approval from the Committee.

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Chris Mills

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - A16 Norwood Improvement

To provide an update on the A16 Norwood Improvement and to seek approval to move to the next stage

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Anna Graham

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Review of Investment Concept Papers KD2024/042

To approve concept papers recommended from the Investment Panel

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - 2025/26 Corporate Strategy and Budget and Medium-Term Financial Plan KD2024/005

To approve the draft Medium-Term Financial Plan for public consultation and to note the developing Corporate Plan.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Janice Gotts, Kate McFarlane

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Corporate Performance Report

To present the Corporate Performance Report Q1 & Q2 2024/25 and the Directorate Performance Report Q2 2024/25 for Members' scrutiny

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Jules Ient

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Budget Monitoring Update - KD2024/060

To provide an update on the revenue and capital budgets for the year to date and to present some environmental project change requests for the Board to consider.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Janice Gotts

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Wider Outcomes Framework and Next Steps

To receive an update on the wider outcomes framework model.

Decision Maker: Skills and Employment Committee

Decision due date: 21/10/2024

Lead officer: Jaki Bradley

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Updates to the Constitution

To present to the Board the sections of the Constitution that have been reviewed/proposed amendments.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Matthew Cumberbatch

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - State of the Region KD2024-014

To approve the State of the Region Report

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Jules Ient

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Skills Brokerage and Future Skills Support for Business

To brief Members on plans for continuity of service beyond UKSPF funding

Decision Maker: Skills and Employment Committee

Decision due date: 21/10/2024

Lead officer: Alexis McLeod

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Adult Skills Fund

To update members on plans for future commissioning of Adult Skills including strategic priorities

Decision Maker: Skills and Employment Committee

Decision due date: 21/10/2024

Lead officer: Andrea Wood

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Further Education Cold Spots

Update on the work plan and next steps

Decision Maker: Skills and Employment Committee

Decision due date: 21/10/2024

Lead officer: Laura Guymer

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Bootcamps Update - KD2024-051

To update members on the outcome of the recent procurement activity and agree delivery plans for 2024/25

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Laura Guymer

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Combined Authority Chief Executive Highlights Report

Providing a general update on the key activities of the Combined Authority since the last meeting.

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Rob Bridge

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - English National Concessionary Travel Scheme -Local Concession Proposal for pre 09.30 Bus Travel KD2024/046

A proposal to enable concessionary pass holders to use the pass to access free transport pre 0930 within the region

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Andrew Highfield

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Peterborough Station Quarter

Update on progress to develop the Full Business Case.

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Gidon Wieder

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Local Transport and Connectivity Plan Sub Strategies

To receive an update on LTCP sub strategy work and to delegate authority to enter into contracts

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Emma White

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Electric Vehicles - KD2024/006

To receive an update and recommend approval of the Electric Vehicle Infrastructure Strategy.

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Emma White

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - University Access Improvements in Peterborough KD2024/017

To provide an update on the project and to seek approval to move to the next stage

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Anna Graham

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - River Nene Pedestrian Bridge (Cygnet Bridge) KD2024/016

To provide an update on the river Nene pedestrian bridge (Cygnet Bridge) Improvement and to seek approval to move to the next stage

Decision Maker: Transport and Infrastructure Committee

Decision due date: 10/01/2025

Lead officer: Anna Graham

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Mid Year Performance Review

To receive a progress report on mid-term performance: funding and strategic focus

Decision Maker: Skills and Employment Committee

Decision due date: 21/10/2024

Lead officer: Andrea Wood

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - New Digital Connectivity Strategy 2025-2029 KD2024/013

To provide the Connecting Cambridgeshire Digital Connectivity annual progress update and to seek approval of the strategy for the future phases of the programme

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Ceren Clulow

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Corporate Risk Report

To present the Corporate Risk Report Q1 2024/25 for Members' scrutiny

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Chris Bolton

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Combined Authority Chief Executive Highlights Report

Providing a general update on the key activities of the Combined Authority since the last meeting.

Decision Maker: Combined Authority Board

Decision due date: 13/11/2024

Lead officer: Rob Bridge

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Updates to the Constitution

To present to the Board the sections of the Constitution that have been reviewed/proposed amendments.

Decision Maker: Combined Authority Board

Decision due date: 16/10/2024

Lead officer: Matthew Cumberbatch

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - 2025/26 Corporate Strategy and Budget and Medium-Term Financial Plan KD2024/054

To note the consultation feedback, approve the Corporate Strategy and Budget and MTFP

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Janice Gotts, Kate McFarlane

Notice of decision: 01/08/2024

Anticipated restriction: Open


01/08/2024 - Combined Authority Chief Executive Highlights Report

Providing a general update on the key activities of the Combined Authority since the last meeting.

Decision Maker: Combined Authority Board

Decision due date: 22/01/2025

Lead officer: Rob Bridge

Notice of decision: 01/08/2024

Anticipated restriction: Open